Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0229

Most viewed - 0229
229-04.jpg
229-0447 viewsYandi Two at the 311.5 km with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with second unit 5642 'Wallareenya' serial 8281-07 / 92-131 trailing sister unit 5650. GeoData.
229-03.jpg
229-0339 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with 5650 'Yawata' serial 8412-07 / 93-141 leading sister unit 5642, grade crossing is the YT 311.5 km. GeoData.
229-08.jpg
229-0836 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151, cab side. GeoData.
229-00.jpg
229-0035 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
229-02.jpg
229-0235 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
229-12.jpg
229-1234 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit, cab side. GeoData.
229-0A.jpg
229-0A33 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
229-09.jpg
229-0933 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit. GeoData.
229-10.jpg
229-1033 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.
229-17.jpg
229-1733 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
229-06.jpg
229-0632 viewsYandi Two at the 311.5 km with an empty BHP train heading for the loadout behind mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing lead remote sister unit 5660. GeoData.
229-07.jpg
229-0732 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout with mid-train remote units Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151 leading sister unit 5657, note the sheet metal windscreen protector plates, grade crossing is the YT 311.5 km. GeoData.
229-11.jpg
229-1132 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.
229-18.jpg
229-1832 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
229-01.jpg
229-0131 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
229-13.jpg
229-1331 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151. GeoData.
229-14.jpg
229-1431 viewsYandi Two loadout, looking through the tunnel and the CM40-8M profile of 5650 can be just made out, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, Yandi Two features to loadout vaults for extra capacity, in later years it allowed two different products, fines and lumps to be stacked. GeoData.
229-15.jpg
229-1531 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
229-05.jpg
229-0529 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout with mid-train remote units Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151 leading sister unit 5657, grade crossing is the YT 311.5 km. GeoData.
229-16.jpg
229-1628 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
35 files on 2 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2022 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional