Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 05-2015

Most viewed - 05-2015
150518_8119.jpg
150518 8119524 viewsBHP Iron Ore old and retired ore stacker #4 and bucket wheel reclaimer #4 are blown apart to aid in the scrapping process.
150505_7937.jpg
150505 7937519 viewsFMG Solomon Line, looking east across earth fill abutment with culverts, sign indicating Babangarra Creek. Geodata: -22.0522533 118.7402133 .
150522_8167.jpg
150522 8167519 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 and 5647 serial 8244-12/92-136 were a pair of new Goninan WA CM40-8 model built in 1992 with a Goninan ALCo rebuild 5657 beside them.
150523_8231.jpg
150523 8231516 viewsNelson Point Yard, view across BI-LO Crossing, a throw back to days that the supermarket was in fact a BI-LO, well before the current Woolworths, and Action before that. Dash 8 units in the yard, on the 5642 with the Steel Train and 5648 with another on a rake of index waggons. The 2 km post can just be made out at the third light pole from the right.
150523_8238.jpg
150523 8238514 viewsNelson Point Yard, BHP Billiton SD70ACe unit leads a rake towards the dumpers. Lead unit 4327 'Hamersley' is from an order originally being built by Electro-Motive, London Ontario for BNSF, an US class 1 railroad, but BHP secured 10 of them during construction, this unit 4327 serial no. 20066862-056 was destined to be BNSF 9185 before coming to BHP.
150522_8184.jpg
150522 8184512 viewsWedgefield, Sims Metal yard, no. 2 end of Goninan WA rebuild CM40-8M unit 5638 serial 8281-02/92-127, for full details of these units past lives see here .
150523_8200.jpg
150523 8200512 viewsNelson Point Yard, overview of both trains from images 8197 and 8198.
150505_7963.jpg
150505 7963505 viewsFMG Solomon Line, a pair of General Electric Dash 9-44CW locomotives 005 serial 58182 and 006 serial 58183 struggle upgrade with a loaded train at the 227 km bound for Port Hedland, the bank engines assisting in the rear can just be seen. Geodata: -22.0189283 118.5861050 .
150523_8234.jpg
150523 8234501 viewsNelson Point Yard, I Area, waggon scrapping by Sims Metal, a fork lift carries waggon no. 3340, one of 350 waggons built in Romania of which only about 60 made it into service, the rest rusting away in a caged embargo area out on the Broome Road until they were scrapped some years ago. There is a connection with these waggons and Lang Hancock and his former mine McCamey's Monster, now known as Jimblebar. 5665 looks on, its days also numbered.
150505_7936.jpg
150505 7936498 viewsFMG Solomon Line, looking east across valley at massive earth fill for rail line. Geodata: -22.0351433 118.7568750 .
150508_8116.jpg
150508 8116495 viewsFMG Solomon Line, empty train lead by triple combination of General Electric Dash 9-44CW 004 serial 58181, EMD SD90MAC-H 916 serial 976833-22 and EMD SD70ACe 710 serial 20118693-002 power through the hills around the Bea Bea Creek area. Geodata: -22.0528200 118.7132450 .
150523_8242.jpg
150523 8242490 viewsNelson Point Yard, loaded ore waggon 5073, a Golynx style waggon built by Goninan, serial no. 950126-114 in 2004 with 5Cr12Ti stainless steel which does away with the need to paint the waggon interiors to prevent wear.
150505_7979.jpg
150505 7979487 viewsFMG Solomon Line, waggon 4006, tare weight of 22 tonnes, built in 2009 by CSR Yangtze Rolling Stock Co. Ltd, loaded with fines ore. Geodata: -22.0187350 118.5850917 .
150505_7951.jpg
150505 7951486 viewsFMG Solomon Line, looking back east from the same spot as 7950. Repeater tower in distance. Geodata: -22.0398833 118.6280733 .
150523_8233.jpg
150523 8233483 viewsNelson Point Yard, I Area, waggon scrapping by Sims Metal, a fork lift carries waggon no. 3340, old 38 TAL or tonne axle load bogies lay around while other cars await the chop. With the move to ECPB train brake control and heavy waggon loads these older style cars are fast becoming obsolete.
150505_7940.jpg
150505 7940479 viewsFMG Solomon Line, looking east, earth fill abutment embankment for rail line, Jingarri Creek. Geodata: -22.0545750 118.7278517 .
150523_8218.jpg
150523 8218478 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0021, total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
150505_7942.jpg
150505 7942467 viewsFMG Solomon Line, looking east, earth fill abutment embankment for rail line, Jingarri Creek, expanded view from 7940, shows access road. Geodata: -22.0545750 118.7278517 .
150505_8002.jpg
150505 8002466 viewsFMG Solomon Line, view looking west from the same point as 8001, approach to Bow Siding. Geodata: -22.0256300 118.4896100 .
150507_8050.jpg
150507 8050464 viewsFMG Solomon Line, bank engines, a pair of General Electric Dash 9-44CW locomotives, units 005 serial 58182 and 006 serial 58183 assist a loaded train at the 278.291 km grade crossing. Geodata: -22.1620833 118.1272300 .
106 files on 6 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional