Most viewed - BHP_Rolling_Stock_-_Non_Ore |

050724 4209408 viewsNelson Point yard, Comeng NSW built 82 kilolitre water tank waggon 0001, one of two such tank waggons built in November 1970, attached to the Pony as they relay a road in the yard.
|
|

060429 3725408 viewsFlash Butt yard, Pony waggon #1, modified from a Magor USA built Oroville ore waggon, with a Comeng built gantry carrier.
|
|

060429 3729408 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining on the 24th September 1970 by Scotts of Ipswich, one of a batch of nine, one of a batch of nine in the series 6005-6013.
|
|

060429 3733408 viewsFlash Butt yard, Pony waggon 6017, built by Comeng WA in 1971 in a batch of three numbered 6014-6017, view of asset number 6506-017.
|
|

110208 9435408 viewsFlash Butt yard, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, squeeze roller location.
|
|

110411 09979408 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
|
|

130720 1435408 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 715, modified from a similar CHQY class with the end framing removed attached to an SD40R unit 3091.
|
|

040806 092042407 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

050412 0755407 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 534, originally in ore service before conversion to a ballast waggon.
|
|

060414 3439407 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton.
|
|

060501 3870407 viewsTabba Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8701 side dump waggon loaded with ballast.
|
|

080621 2715407 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6101 in service with the rail recovery and transport train as waggon #7.
|
|

080621 2731407 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, close up of bogie and detail of A end.
|
|

040806 092730406 viewsGoldsworthy Junction, weighbridge test waggon 507, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon.
|
|

040815 171350406 viewsNelson Point, detail view of data placard of fuel tank waggon 0020, 82 kilolitre capacity built by Comeng NSW for BP as RTC 2, used by Mt Newman Mining, unsure when converted to 0020.
|
|

050412 0771406 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 523, originally in ore service before conversion to a ballast waggon.
|
|

051001 5642406 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam next to CFCLA ballast waggon CHQY class CHQY 734.
|
|

060429 3738406 viewsFlash Butt yard, Pony re-laying waggon, #1, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
|
|

060429 3750406 viewsFlash Butt yard, Pony re-laying flat waggon, in service as a transport waggon for a gantry car and sleepers. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
|
|

110208 9446406 viewsFlash Butt yard, new rail stock carrier waggons 6038 and 6031 loaded with strings of rail, built by Gemco Rail in late 2009-10.
|
|
| 797 files on 40 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
12 |  |
 |
 |
 |
 |
 |
 |
|