Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Rolling_Stock_-_Non_Ore

Most viewed - BHP_Rolling_Stock_-_Non_Ore
160128_00337.jpg
0041 CNR - QRRS China 160128 00337410 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0041, one of a second batch delivered in 2015 with safety slogan 'Stay alert don't get hurt'.
040806_102956.jpg
0661 Mt Newman Mining Workshops 040806 102956409 viewsFlash Butt yard, heavily modified Magor USA built ex-Oroville Dam ore waggon 661, seen here modified for LocoTrol service and testing.
050412_0772.jpg
0502 Magor USA 050412 0772409 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 502.
050421_1383.jpg
0516 Magor USA 050421 1383409 viewsQuarry 8, Shaw Siding area, Dash 8 unit 5636 shunts the loaded ballast rake under the water point on the south leg of the triangle. Original Magor USA built ballast cars 516 and 504 dating from a 1963 build.
050518_2117.jpg
CHRY 746 050518 2117409 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746, rear view of hydraulics and pneumatics.
051001_5641.jpg
0538 Mt Newman Mining Workshops 051001 5641409 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, shows bogie and hand brake detail.
051001_5643.jpg
0538 Mt Newman Mining Workshops 051001 5643409 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam, through brake pipe is visible over the top of waggon.
051001_5729.jpg
0665 Magor USA 051001 5729409 viewsBoodarie, the Steel Train or rail recovery and transport train, cut down by Mt Newman Mining workshops, a Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the end of the steel train.
060429_3732.jpg
6017 Comeng WA 060429 3732409 viewsFlash Butt yard, Pony waggon 6017, built by Comeng WA in 1971 in a batch of three numbered 6014-6017, with asset number 6506-017.
060429_3758.jpg
060429 3758409 viewsFlash Butt yard, Pony re-laying waggon, builders plate originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
130720_1447.jpg
0214 CNR - QRRS China 130720 1447409 viewsFlash Butt yard, CNR-QRRS of China built 99 tonne ballast waggons 0214 and 0212 loaded awaiting their next duty.
150523_8219.jpg
0024 CNR - QRRS China 150523 8219409 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0024, one of a batch of ten built in 2014.
150619_9079.jpg
0706 CNR - QRRS China 150619 9079409 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting, B end and bogie detail.
160128_00329.jpg
0045 CNR - QRRS China 160128 00329409 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0045, one of a second batch delivered in 2015 with safety slogan 'Safety doesn't stop at work'.
160128_00338.jpg
0040 CNR - QRRS China 160128 00338409 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0040, one of a second batch delivered in 2015 with safety slogan 'Think Safe - Act Safe'.
040806_102536.jpg
2703 Mt Newman Mining Workshops 040806 102536408 viewsFlash Butt yard, view of the end of test waggon 2703 showing the collection of cables and the Do Not Uncouple sign.
110208_9443.jpg
6031 Gemco WA 110208 9443408 viewsFlash Butt yard, new rail stock carrier waggon 6031 loaded with strings of rail, built by Gemco Rail in late 2009-10 with Barber bogies.
110619_1881.jpg
6210 Comeng WA 110619 1881408 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #11, 6210, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
150314_7745.jpg
0011 Comeng NSW 150314 7745408 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
040806_092738.jpg
0510 Mt Newman Mining Workshops 040806 092738407 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a weighbridge test waggon. The others in the fleet are 40, 60 and 100 tons.
822 files on 42 page(s) 17

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional