Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Rolling_Stock_-_Non_Ore

Most viewed - BHP_Rolling_Stock_-_Non_Ore
060429_3758.jpg
060429 3758187 viewsFlash Butt yard, Pony re-laying waggon, builders plate originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
060501_3869.jpg
060501 3869187 viewsTabba Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8701 side dump waggon loaded with ballast.
060710_6301.jpg
060710 6301187 viewsBoodarie Yard, modified original Magor USA built Oroville waggon 589, cut down and covered and in use as indexing waggons on the front of each rake for Finucane Island car dumpers, note the original ODCX marking visible.
060713_6547.jpg
060713 6547187 viewsBoodarie Yard, modified original Magor USA built Oroville waggon 594, cut down and covered and in use as indexing waggons on the front of each rake for Finucane Island car dumpers, note the original ODCX marking visible.
071202_1230.jpg
071202 1230187 viewsTurner Siding, flat waggon 8500, originally built by Tomlinson Steel WA for Goldsworthy Mining as one of six 55 ton flat waggons built in 1966, and later modified by BHP to increase its capacity.
080621_2714.jpg
080621 2714187 viewsTabba South, rail recovery and transport train, waggon #29, 1st lead off waggon 6011, built by Scotts of Ipswich Qld on 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible. In between 6702 and 6201.
081217_0451.jpg
081217 0451187 viewsWoodstock Siding, rail recovery and transport train flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne flat waggon and designated the winch waggon with generator set to power the winch and the crib car.
081217_0452.jpg
081217 0452187 viewsWoodstock Siding, rail recovery and transport train, waggon #29, 1st lead off waggon 6011, built by Scotts of Ipswich Qld on 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
110208_9429.jpg
110208 9429187 viewsFlash Butt yard, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
110208_9431.jpg
110208 9431187 viewsFlash Butt yard, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
110411_10034.jpg
110411 10034187 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
130720_1558.jpg
130720 1558187 viewsFlash Butt yard, rail recovery and transport train, flat waggon 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
150619_9101.jpg
150619 9101187 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0713 loaded with fines for sheeting, A end and bogie detail.
160128_00338.jpg
160128 00338187 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0040, one of a second batch delivered in 2015 with safety slogan 'Think Safe - Act Safe'.
040806_091154.jpg
040806 091154186 viewsGoldsworthy Junction, trailing view of the weighbridge test train with the four orange weighbridge test waggons and two Comeng built ore waggons to provide braking, 5666 is the power.
040806_092738.jpg
040806 092738186 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a test waggon.
040806_101934.jpg
040806 101934186 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of brake lever arrangement.
050518_2078.jpg
050518 2078186 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 751.
050518_2086.jpg
050518 2086186 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 757.
050518_2091.jpg
050518 2091186 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 747.
797 files on 40 page(s) 17

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional