Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Rolling_Stock_-_Non_Ore

Most viewed - BHP_Rolling_Stock_-_Non_Ore
060618_6211.jpg
060618 6211344 viewsAbydos Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8704 side dump waggon loaded with fines for pad capping.
110208_9443.jpg
110208 9443344 viewsFlash Butt yard, new rail stock carrier waggon 6031 loaded with strings of rail, built by Gemco Rail in late 2009-10 with Barber bogies.
130720_1558.jpg
130720 1558344 viewsFlash Butt yard, rail recovery and transport train, flat waggon 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
150523_8217.jpg
150523 8217344 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0044, one of a second batch delivered in 2015 with safety slogan 'Don't drive distracted'.
160128_00339.jpg
160128 00339344 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015 with safety slogan 'Safety - It's your life'.
050319_0144.jpg
050319 0144343 viewsNelson Point, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
050412_0769.jpg
050412 0769343 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 524, originally in ore service before conversion to a ballast waggon.
050518_2097.jpg
050518 2097343 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 740.
050518_2165.jpg
050518 2165343 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 523, originally in ore service before conversion to a ballast waggon.
050518_2171.jpg
050518 2171343 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050518_2182.jpg
050518 2182343 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 534, originally in ore service before conversion to a ballast waggon.
051001_5628.jpg
051001 5628343 viewsFlash Butt yard, BHP flat waggon 6705 with EDI decal and ROA code of AQPY 2916, 55 tonne capacity, unsure of original owner, possible AN AOOX, then cut down to the Pilbara through CFCLA.
051001_5700.jpg
051001 5700343 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #18, 6012, detail of builders plate, a Scotts of Ipswich Qld built flat waggon with build date 11-09-1970.
051001_5707.jpg
051001 5707343 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #22, 6213, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
051001_5730.jpg
051001 5730343 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
051001_5739.jpg
051001 5739343 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
051001_5740.jpg
051001 5740343 viewsBoodarie, the Steel Train or rail recovery and transport train, cut down by Mt Newman Mining workshops, a Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the end of the steel train.
060414_3441.jpg
060414 3441343 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 522 seen here modified as a weighbridge test car.
060429_3744.jpg
060429 3744343 viewsFlash Butt yard, Pony re-laying flat waggon, in service as a transport waggon for a gantry car and sleepers. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
080621_2729.jpg
080621 2729343 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, detail of A end.
797 files on 40 page(s) 24

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional