Most viewed - BHP_Rolling_Stock_-_Non_Ore |

051001 5690340 viewsBoodarie, the Steel Train or rail recovery and transport train, builders plate detail of flat waggon #14, 6207, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

051001 5691340 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #15, 6206, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

051001 5717340 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #24, 6005, builders plate, a Scotts of Ipswich Qld built flat waggon on 12th September 1970.
|
|

051001 5741340 viewsBoodarie, the Steel Train or rail recovery and transport train, cut down by Mt Newman Mining workshops, a Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the end of the steel train.
|
|

050522 2738340 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #28, second lead in waggon 6201, built by Comeng WA in January 1977 under order number 07-M-282 RY, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

060429 3756340 viewsFlash Butt yard, Pony re-laying waggon, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
|
|

060618 6210340 viewsAbydos Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8703 side dump waggon loaded with fines for pad capping.
|
|

080621 2719340 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6103 in service with the rail recovery and transport train as waggon #3.
|
|

040806 092046339 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

040814 091958339 viewsNelson Point, CFCLA ballast waggon CHQY type 730 just being delivered to BHP Iron Ore as part of the Rail PACE project, 3/4 view from handbrake end.
|
|

050518 2071339 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 730.
|
|

050518 2119339 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of number board and 50 t load stencil.
|
|

050518 2186339 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 519, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050801 4772339 viewsFlash Butt yard, rail recovery and transport train flat waggon #26, 6015, built by Comeng WA in November 1971, view of original style number.
|
|

051001 5642339 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam next to CFCLA ballast waggon CHQY class CHQY 734.
|
|

051001 5650339 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, shows bogies and hand brake detail.
|
|

051001 5682339 viewsBoodarie, the Steel Train or rail recovery and transport train holds the main towards Finucane Island, a loaded rake of Comeng WA and Scotts of Ipswich Qld flat waggons make up the consist.
|
|

051001 5692339 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #16, 6009, a Scotts of Ipswich Qld built flat waggon from September 1970.
|
|

051001 5732339 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
|
|

051001 5733339 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
|
|
| 797 files on 40 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
27 |  |
 |
 |
 |
 |
 |
 |
|