Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Rolling_Stock_-_Non_Ore

Most viewed - BHP_Rolling_Stock_-_Non_Ore
150314_7751.jpg
150314 7751282 viewsBing Siding, empty 82 kL Comeng NSW built tank waggon 0008 one of six such tank waggons built in 1970-71.
150523_8223.jpg
150523 8223282 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0037, one of a second batch delivered in 2015 with safety slogan 'Safety is a core value'.
040806_091930.jpg
040806 091930281 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
040815_164812.jpg
040815 164812281 viewsNelson Point, CFCLA ballast waggon CHQY type 730, view from handbrake end.
050412_0759.jpg
050412 0759281 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 520.
050412_0765.jpg
050412 0765281 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 503.
050518_2089.jpg
050518 2089281 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 749.
050518_2115.jpg
050518 2115281 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746, rear view.
050518_2127.jpg
050518 2127281 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 750, shows bogie detail, AT & SF CS-3000 bogie casting with CFCLA id of CQFE 094
050518_2171.jpg
050518 2171281 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
051001_5625.jpg
051001 5625281 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, pushed into an earth bund.
051001_5644.jpg
051001 5644281 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam, through brake pipe is visible over the top of waggon.
051001_5741.jpg
051001 5741281 viewsBoodarie, the Steel Train or rail recovery and transport train, cut down by Mt Newman Mining workshops, a Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the end of the steel train.
050522_2735.jpg
050522 2735281 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #25, 6014, built by Comeng WA in November 1971.
060429_3735.jpg
060429 3735281 viewsFlash Butt yard, Pony re-laying waggon, 6002 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.
060429_3736.jpg
060429 3736281 viewsFlash Butt yard, Pony re-laying waggon, 6001 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.
060501_3896.jpg
060501 3896281 viewsTabba Siding, built by Difco USA in 1971 for Mt Newman Mining in a group of four, side dump waggon 702.
060501_3945.jpg
060501 3945281 viewsSpring Siding, flat waggon #5, also marked as 6705 in the back track, originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
060618_6220.jpg
060618 6220281 viewsFlash Butt yard, modified original Magor USA built Oroville waggon 567, cut down and covered for use as indexing waggons at Finucane Island car dumpers, note the original ODCX marking visible.
060714_6817.jpg
060714 6817281 viewsHesta Siding, rail recovery and transport train flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne flat waggon and designated the winch waggon with generator set to power the winch and the crib car.
797 files on 40 page(s) 31

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional