Most viewed - Jim_Bisdee_Pilbara_related_images. |

19799599 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view of the radiator section with the lube filter and cooler visible on the no. 2 end. Sept 2003.
Jim Bisdee photo.
|
|

22473599 viewsBassendean, Goninan workshops, Robe River's Comeng NSW built ALCo model M636 9422 serial C6103-2 is undergoing rebuilding into a GE CM40-8M unit, it would emerge rebuilt in March 1993. Image September 1992.
Jim Bisdee photo.
|
|

23713598 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 being scrapped to frame level, cab section on truck. December 1992.
Jim Bisdee photo.
|
|

23877597 viewsBassendean, Goninan workshops, an unidentified ALCo to GE CM40-8M rebuild unit, could be 5648. July 1993.
Jim Bisdee photo.
|
|

21248596 viewsBassendean, Goninan workshops, sitting on shop bogies out the back, BHP Iron Ore Goninan GE CM40-8ML - L for LocoTrol - rebuild unit 5664 serial 8412-09 / 94-155 was rebuilt without a cab and fitted with LocoTrol II from AE Goodwin ALCo M636 5469 serial G6047-1. September 1994.
Jim Bisdee photo.
|
|

5948 001 Welshpool 1987Jan595 viewsBuilders plate on Goninan rebuilt GE C36-7M unit 5506 'Mt Whaleback' serial 4839-01 / 87-071 rebuilt using Mt Newman Mining AE Goodwin ALCo C636 5455 serial G6012-4. January 1987.
Jim Bisdee photo.
|
|

6993 001595 viewsWelshpool, Goninan Open Day 27th August, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
|
|

5946 001 Welshpool 1986Sept586 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
|
|

6984 001586 viewsWelshpool, Goninan Open Day 27th August, 1988. New GE 7FDL-16 prime mover awaiting fitting to one of the new CM39-8 units.
Jim Bisdee photo.
|
|

24134583 viewsBassendean, Collier Road, Key Transport hauling the final BHP Iron Ore Goninan GE rebuilt CM40-8M unit 5669 serial 8412-02 / 95-160, which is actually an CM40-8MEFI as the final three had electronic fuel injection fitted to their 7FDL-16 engines. 5669 was rebuilt from Comeng NSW built ALCo M636 model 5486 serial C6084-2. July 1995.
Jim Bisdee photo.
|
|

3584 001582 viewsBassendean, Wood St, delivery of the final BHP CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160. Unit was rebuilt as one of three with an electronic fuel injected prime mover by Goninan from Comeng built ALCo M636 unit 5486 serial C6084-2. Date July 1995.
Jim Bisdee photo.
|
|

20956581 viewsBassendean, Goninan workshops, sitting outside the gates waiting to head to Cape Lambert, Robe River Goninan GE CM40-8M rebuild unit 9411 serial 8206-02 / 92-125, retains its original Robe River road number on a hundred and twenty wheel road float. 9411 was rebuilt into the GE CM40-8M unit from AE Goodwin ALCo M636 serial G6060-2. February 1992.
Jim Bisdee photo.
|
|

23100580 viewsBassendean, Goninan workshops, loaded onto a hundred and four six wheel road transport float, Robe River rebuild GE CM40-8M unit 9422 serial 8297-03 / 93-138 is loaded awaiting transport to Cape Lambert. 9422 was rebuilt from Comeng NSW built ALCo M636 9422 serial C6103-2 from Aug 1977 and kept this number when rebuilt here. March 1993.
Jim Bisdee photo.
|
|

22651578 viewsBassendean, during an Open Day at the Goninan workshops, an up turned ALCo frame is in the process of being converted to a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
|
|

23711578 viewsBassendean, Goninan workshops, 'on loan' the ARHS B class shunt engine is coupled to Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5472 serial G6047-4 undergoing rebuilding into a GE CM40-8M unit, 5472 would emerge rebuilt as 5651 in August 1993. December 1992.
Jim Bisdee photo.
|
|

20955577 viewsBassendean, Goninan workshops, sitting outside the gates waiting to head to Cape Lambert, Robe River Goninan GE CM40-8M rebuild unit 9411 serial 8206-02 / 92-125, retains its original Robe River road number on a hundred and twenty wheel road float. 9411 was rebuilt into the GE CM40-8M unit from AE Goodwin ALCo M636 serial G6060-2. February 1992.
Jim Bisdee photo.
|
|

24905576 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5503 serial C6104-1 sits out the back in a partially stripped state. This unit was subsequently scrapped. July 1995.
Jim Bisdee photo.
|
|

6979 001576 viewsWelshpool, Goninan Open Day 27th August, 1988. New bogie and traction motor for the GE CM39-8 units.
Jim Bisdee photo.
|
|

22331575 viewsBassendean, Goninan inside workshops, CM40-8M frames being modified. July 20 1991.
Jim Bisdee photo.
|
|

23712574 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 being scrapped to frame level, hood section on truck. December 1992.
Jim Bisdee photo.
|
|
|
|