6983_001.jpg
6983 001149 viewsWelshpool, Goninan Open Day 27th August, 1988. View of the assembly floor area, brand new GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 under construction for Mt Newman Mining masked up ready for painting with sister unit 5632 inline behind it.
Jim Bisdee photo.
3585_001.jpg
3585 001148 viewsBassendean, Wood St, delivery of the final BHP CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160. Unit was rebuilt as one of three with an electronic fuel injected prime mover by Goninan from Comeng built ALCo M636 unit 5486 serial C6084-2. Date July 1995.
Jim Bisdee photo.
5942_001_Welshpool_1986Sept.jpg
5942 001 Welshpool 1986Sept148 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive. In the September 1986 view the process has started and it is on shop bogies, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
22668.jpg
22668148 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M in the background and some ALCo Hi-Ad trucks being overhauled. 20th July 1991.
Jim Bisdee photo.
23143.jpg
23143148 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 5482 serial G6061-3 is undergoing rebuilding into a GE CM40-8M unit, it would emerge rebuilt in September 1993 as 5652. March 1993.
Jim Bisdee photo.
23694.jpg
23694148 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 undergoing rebuilding into a GE CM40-8M unit, 5473 would emerge rebuilt as 5649 in July 1993. December 1992.
Jim Bisdee photo.
6984_001.jpg
6984 001147 viewsWelshpool, Goninan Open Day 27th August, 1988. New GE 7FDL-16 prime mover awaiting fitting to one of the new CM39-8 units.
Jim Bisdee photo.
22708.jpg
22708146 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 5477 serial G6047-9 is undergoing rebuilding into a GE CM40-8M unit, it would emerge rebuilt in June 1993 as 5648.
Jim Bisdee photo.
23666.jpg
23666146 viewsBassendean, Goninan workshops, view of several Mt Newman Mining AE Goodwin built ALCo M636 units, 5481 serial G6061-2, 5473 serial G6047-5 and 5477 serial G6047-9 awaiting rebuilding. December 1992.
Jim Bisdee photo.
23721.jpg
23721146 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. December 1992.
Jim Bisdee photo.
23731.jpg
23731146 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. January 1993.
Jim Bisdee photo.
5946_001_Welshpool_1986Sept.jpg
5946 001 Welshpool 1986Sept145 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
24134.jpg
24134145 viewsBassendean, Collier Road, Key Transport hauling the final BHP Iron Ore Goninan GE rebuilt CM40-8M unit 5669 serial 8412-02 / 95-160, which is actually an CM40-8MEFI as the final three had electronic fuel injection fitted to their 7FDL-16 engines. 5669 was rebuilt from Comeng NSW built ALCo M636 model 5486 serial C6084-2. July 1995.
Jim Bisdee photo.
24135.jpg
24135145 viewsBassendean, Collier Road, Key Transport hauling the final BHP Iron Ore Goninan GE rebuilt CM40-8M unit 5669 serial 8412-02 / 95-160, which is actually an CM40-8MEFI as the final three had electronic fuel injection fitted to their 7FDL-16 engines. 5669 was rebuilt from Comeng NSW built ALCo M636 model 5486 serial C6084-2. July 1995.
Jim Bisdee photo.
6995_001_Welshpool_19880819.jpg
6995 001 Welshpool 19880819144 viewsWelshpool, Goninan workshops, under construction Mt Newman Mining's GE model CM39-8 loco 5630 'Zeus' serial 5831-09 / 88-079, 19th August 1988 image.
Jim Bisdee photo.
20861.jpg
20861144 viewsBassendean, Goninan workshops, sitting outside the locked gates having just been bought down from Port Hedland, Mt Newman Mining's AE Goodwin ALCo C636 unit 5454 serial G6012-3 on a ninety six wheel road float. 5454 will be rebuilt into CM40-8M unit 5641 by June 1992. Image taken January 1992.
Jim Bisdee photo.
22666.jpg
22666144 viewsBassendean, during an Open Day at the Goninan workshops, new GE-7FDL-16 prime-movers, some with GMG187 main alternators for install into a GE CM40-8M rebuilds and some GE752 AH traction motors. 20th July 1991.
Jim Bisdee photo.
23732.jpg
23732144 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. January 1993.
Jim Bisdee photo.
24905.jpg
24905144 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5503 serial C6104-1 sits out the back in a partially stripped state. This unit was subsequently scrapped. July 1995.
Jim Bisdee photo.
19800.jpg
19800143 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, front on view of cab remains. Sept 2003.
Jim Bisdee photo.
121 files on 7 page(s) 4

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional