Great Northern Highway, between the 18 and 18.2 km grade crossings sees Roy Hill loaded fuel train with General Electric built ES44ACi units RHA 1018 serial 63829 leading RHA 1019, CFCLA lease unit Goninan ALCo to GE rebuild CM40-8M unit CD 4302 and RHA 1013 with eleven loaded fuel tank waggons. CD 4302 is the only unit powering as it was being tested prior to mainline service. 17th January 2018.