Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 05-08_2017
170729 0289
Maitland Siding on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 will stay on the main as an empty train waits on the passing siding. 29th July 2017. [url=https://goo.gl/maps/CNgRRqCioHp]GeoData[/url].
Keywords: 9114;GE;ES44ACi;62545;

170729 0289

Maitland Siding on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 will stay on the main as an empty train waits on the passing siding. 29th July 2017. GeoData.

170729_0191.jpg 170729_0288.jpg 170729_0289.jpg 170729_0303.jpg 170729_0322.jpg
Rate this file (No vote yet)
File information
Filename:170729_0289.jpg
Album name:admin / 05-08_2017
Keywords:9114 / GE / ES44ACi / 62545 /
Location:Maitland Siding, WA
Code and Number:9114
Builder / Type / Model:GE ES44ACi
Serial / Builder's Number:62545
Filesize:430 KiB
Date added:Oct 16, 2017
Dimensions:1280 x 853 pixels
Displayed:98 times
DateTime Original:2017:07:29 13:40:55
Exposure Time:1/800 sec
FNumber:f/7.1
Focal length:135 mm
Make:Canon
Model:Canon EOS 5D Mark III
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=13853
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional