Maitland Siding on the former Robe River line an empty Mesa A bound train behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9117 serial 63830 and sister unit 9115 pull out of the passing siding and onto the mainline. 29th July 2017. GeoData.