Pilbara Railways Image Collection
The entire photo collection of images scanned from negatives and slides and digital images.
Home
Login
Album list
Last uploads
Last comments
Most viewed
Top rated
My Favourites
Search
Home
>
Pilbara negative and digital Albums - Iron Ore
>
0255
FILE 12/37
255-12
At the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata
location here
. May 2002.
Rate this file
(No vote yet)
Javascript must be enabled in order to vote
File information
Filename:
255-12.jpg
Album name:
admin
/
0255
Location:
162.2 km, WA
Filesize:
653 KiB
Date added:
Sep 12, 2021
Dimensions:
1280 x 853 pixels
Displayed:
25 times
URL:
https://pilbararailways.com.au/gallery/displayimage.php?pid=15732
Favourites:
Add to Favourites
Set Back to Pilbara Yard
/
Photo Gallery
/
Blog
/
Departure Yard
/
BHP Road
/
Fortescue Metals Road
/
Rio Tinto Road
/
Roy Hill Road
/
Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au
Contact Us