Maitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.