Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0256
256-30
At the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
Keywords: 9414;Goninan;GE;CM40-8M;8206-11/91-124;rebuild;AE-Goodwin;ALCo;M636;G6060-5;

256-30

At the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.

256-28.jpg 256-29.jpg 256-30.jpg 256-31.jpg 256-32.jpg
Rate this file (No vote yet)
File information
Filename:256-30.jpg
Album name:admin / 0256
Keywords:9414 / Goninan / GE / CM40-8M / 8206-11/91-124 / rebuild / AE-Goodwin / ALCo / M636 / G6060-5 /
Location:Maitland, WA
Code and Number:9414
Builder / Type / Model:Goninan GE CM40-8M
Serial / Builder's Number:8206-11 / 91-124
Filesize:455 KiB
Date added:Nov 20, 2021
Dimensions:1280 x 853 pixels
Displayed:31 times
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=15791
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional