Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

0220


220-20.jpg

BHP GML line, Taplin Siding and Ruben Junction, loaded train with C36-7M.
Goldsworthy Junction empty train with CM40-8M.

35 files, last one added on Dec 26, 2014
Album viewed 413 times

0221


221-09.jpg

Continuation of Album 0207.
Yarrie line, Hardie Siding with Dash 7 5513 and Dash 8 5669 crossing.
BHP Yandi One loadout with new AC6000 locomotive 6074.
August 1999.

37 files, last one added on Sep 19, 2015
Album viewed 422 times

0222


222-29.jpg

BHP at the 105 km crossing.
Green Tank Pool.
Hamersley Iron Dash 9 driver changeover at Lizard Siding.

37 files, last one added on Oct 26, 2015
Album viewed 385 times

0223


223-35.jpg

Hamersley Iron rail grinder and 9-44CW units 7082 and 7072 with a loaded and 7082 and 7080 on an empty at Possum Siding 225-229 km on the Tom Price line.
21st October 2000.

36 files, last one added on Oct 25, 2015
Album viewed 467 times

0224


224-16.jpg

AC6000 class run an empty train out of Bing Siding, 6076, 6073 and mid-train unit 6075, following a cross with a loaded headed up by the old standard of two pairs of double Dash 8 units.

37 files, last one added on Oct 27, 2015
Album viewed 334 times

0225


225-17.jpg

BHP Dash 8 5669 light engine at Bing.
Empty train with double AC6000 6074, 6075 and AC6000 6073 mid-train.

30 files, last one added on Oct 28, 2015
Album viewed 241 times

0226


226-36.jpg

Yule River bridge repaired sections.
Garden and Shaw siding details and signal details.
Loaded train at Redmont Airstrip, double Dash 8.
Rail grinder at Shaw, loaded train at Shaw, double Dash 8.

37 files, last one added on Nov 13, 2015
Album viewed 249 times

0227


227-07.jpg

BHP Nelson Point berths.
Cargill Salt pile.
Empty train 5649, 5651, 6070, 5659 and 5641.
25 km signal site.

37 files, last one added on Nov 13, 2015
Album viewed 241 times

0228


228-00.jpg

Yandi 2 loaded train departing.
Empty train arriving.
CM40-8M units 5667, 5649, 5644, 5669 and 5638.
Sunday 18th May, 1997.
GeoData is only approximate.

38 files, last one added on Nov 13, 2015
Album viewed 243 times

0229


229-19.jpg

Empty train arriving at Yandi 2 and through load-out.
CM40-8M units 5650, 5642, 5660 and 5657.
May 1997.
GeoData is only approximate.

35 files, last one added on Nov 13, 2015
Album viewed 243 times

0230


230-21.jpg

Empty train arriving at Yandi 2 and through load-out.
CM40-8M units 5654, 5637, 5657 and 5639.
June 1997.
GeoData is only approximate location.

38 files, last one added on Nov 13, 2015
Album viewed 233 times

0231


231-36.jpg

Yandi Two balloon loop, train being loaded with CM40-8M units 5652 and 5650.
GeoData is only approximate location.

38 files, last one added on Mar 21, 2016
Album viewed 227 times

0232


232-30.jpg

Yandi 2 views.
5665 cabless unit at Yandi 1.
5639 on a supply train at Yandi 1.

38 files, last one added on Mar 21, 2016
Album viewed 282 times

0233


233-25.jpg

Yandi 2, train being loaded. CM40-8M units 5650, 5634.

37 files, last one added on Mar 21, 2016
Album viewed 236 times

0234


234-20.jpg

Yandi 2, loaded train, CM40-8M units 5640, 5658 and CM39-8 unit 5630.

37 files, last one added on Mar 21, 2016
Album viewed 248 times

0235


235-11.jpg

Yandi 2, empty train arrives.
Yandi 1 loaded train.

37 files, last one added on Mar 21, 2016
Album viewed 249 times

64 albums on 4 page(s) 2

Random files - Pilbara negative and digital Albums - Iron Ore
110620_2392r.jpg
110620 2392r201 viewsWalla, comparison between loaded BHP ore waggons from Comeng WA in 2925 and from Astra Vagoane, Arad Romania in 3312. 2925 is from a batch of four hundred built in 1971 by Comeng WA, while 3312 is from a batch of three hundred and fifty built in 1988 by Astra Vagoane, of which only two hundred and eighty-four didn't enter service. The Comeng build features square side and floor joins, while the Astra Vagoane build is all rounded. 20th of June 2011.
253-14.jpg
253-14210 viewsPort Hedland harbour sees the suction / cutter dredge Vlaanderen XI with IMO #7712080. The Vlaanderen XI was originally built in 1978 by IHC Dredgers with yard number 1108 and originally named New Amsterdam, named the Vlaanderen XI in 1986, renamed again in 2007 to Kaveri and again to Huta 15 in 2014.
150619_9095.jpg
150619 9095258 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, shows coupling and connections to driving module, 2500 litre water tank, electrical cabinet, blower fans and filter housing, grinding hood between bogies.
269-21.jpg
269-21200 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional