|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 67 albums on 5 page(s) |
2 |  |
 |
|
Random files - Pilbara negative and digital Albums - Iron Ore |

255-15329 viewsAt the 162.2 km looking north are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale lone is on the left while the spur runs behind the photographer and curves away from the Deepdale line. Geodata location here. May 2002.
|
|

0446 060722 7530158 viewsRobe River ore waggon 446, built by Tomlinson Steel WA, handbrake side loaded view at the 78.8 km between Western Creek and Maitland on the Deepdale line. July 22, 2006.
|
|

0745 141124 6801141 viewsRobe River ore waggon 745, built by Tomlinson Steel WA, fixed coupler handbrake side empty view, stencil says TEST 4, at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
|
|

060501 3906408 viewsAbydos Siding backtrack, Speno rail grinders RG 2 coupled to RG 1. 1st May 2006.
|
|