Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

0220


220-18.jpg

BHP GML line, Taplin Siding and Ruben Junction, loaded train with C36-7M.
Goldsworthy Junction empty train with CM40-8M.

35 files, last one added on Dec 26, 2014
Album viewed 459 times

0221


221-12.jpg

Continuation of Album 0207.
Yarrie line, Hardie Siding with Dash 7 5513 and Dash 8 5669 crossing.
BHP Yandi One loadout with new AC6000 locomotive 6074.
August 1999.

37 files, last one added on Sep 19, 2015
Album viewed 462 times

0222


222-19.jpg

BHP at the 105 km crossing.
Green Tank Pool.
Hamersley Iron Dash 9 driver changeover at Lizard Siding.

37 files, last one added on Oct 26, 2015
Album viewed 422 times

0223


223-20.jpg

Hamersley Iron rail grinder and 9-44CW units 7082 and 7072 with a loaded and 7082 and 7080 on an empty at Possum Siding 225-229 km on the Tom Price line.
21st October 2000.

36 files, last one added on Oct 25, 2015
Album viewed 687 times

0224


224-28.jpg

AC6000 class run an empty train out of Bing Siding, 6076, 6073 and mid-train unit 6075, following a cross with a loaded headed up by the old standard of two pairs of double Dash 8 units.

37 files, last one added on Oct 27, 2015
Album viewed 374 times

0225


225-06.jpg

BHP Dash 8 5669 light engine at Bing.
Empty train with double AC6000 6074, 6075 and AC6000 6073 mid-train.

30 files, last one added on Oct 28, 2015
Album viewed 298 times

0226


226-31.jpg

Yule River bridge repaired sections.
Garden and Shaw siding details and signal details.
Loaded train at Redmont Airstrip, double Dash 8.
Rail grinder at Shaw, loaded train at Shaw, double Dash 8.

37 files, last one added on Nov 13, 2015
Album viewed 288 times

0227


227-27.jpg

BHP Nelson Point berths.
Cargill Salt pile.
Empty train 5649, 5651, 6070, 5659 and 5641.
25 km signal site.

37 files, last one added on Nov 13, 2015
Album viewed 267 times

0228


228-05.jpg

Yandi 2 loaded train departing.
Empty train arriving.
CM40-8M units 5667, 5649, 5644, 5669 and 5638.
Sunday 18th May, 1997.
GeoData is only approximate.

38 files, last one added on Nov 13, 2015
Album viewed 280 times

0229


229-04.jpg

Empty train arriving at Yandi 2 and through load-out.
CM40-8M units 5650, 5642, 5660 and 5657.
May 1997.
GeoData is only approximate.

35 files, last one added on Nov 13, 2015
Album viewed 274 times

0230


230-17.jpg

Empty train arriving at Yandi 2 and through load-out.
CM40-8M units 5654, 5637, 5657 and 5639.
June 1997.
GeoData is only approximate location.

38 files, last one added on Nov 13, 2015
Album viewed 257 times

0231


231-09.jpg

Yandi Two balloon loop, train being loaded with CM40-8M units 5652 and 5650.
GeoData is only approximate location.

38 files, last one added on Mar 21, 2016
Album viewed 273 times

0232


232-01.jpg

Yandi 2 views.
5665 cabless unit at Yandi 1.
5639 on a supply train at Yandi 1.

38 files, last one added on Mar 21, 2016
Album viewed 319 times

0233


233-27.jpg

Yandi 2, train being loaded. CM40-8M units 5650, 5634.

37 files, last one added on Mar 21, 2016
Album viewed 266 times

0234


234-23.jpg

Yandi 2, loaded train, CM40-8M units 5640, 5658 and CM39-8 unit 5630.

37 files, last one added on Mar 21, 2016
Album viewed 285 times

0235


235-32.jpg

Yandi 2, empty train arrives.
Yandi 1 loaded train.

37 files, last one added on Mar 21, 2016
Album viewed 284 times

67 albums on 5 page(s) 2

Random files - Pilbara negative and digital Albums - Iron Ore
250501_0519.jpg
250501 0519222 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2765 - GA 2766, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
100717_0693.jpg
100717 0693330 viewsFlash Butt yard, new rail stock carrier waggon 6027, built by Gemco Rail in late 2009-10 with Barber bogies.
180616_1800r.jpg
180616 1800r561 viewsEmu Siding, a rare sight in the Pilbara, a Rio Tinto pink iron ore waggon pair to raise awareness for breast cancer. Chinese built Bradken B type waggon pair 20475 control and 25475 slave with a build date of July 2014, still holding colour pretty well in June 2018. GeoData.
250-36.jpg
250-361875 viewsCape Lambert South Yard and Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper. 22nd October 2000.

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional